How Much Does House Refurbishment Cost?

Whole-house refurbishment costs covering kitchens, bathrooms, rewiring, replumbing, replastering and decoration in London period and modern homes.

Budget

£38,000

Average

£70,500

Premium

£142,000

House Refurbishment Price Breakdown

ItemBudgetMid-RangePremiumNotes
Strip-out & disposal£2,500£5,000£9,000-
Rewire (full)£5,500£8,500£14,000-
Replumb & heating£6,500£10,000£16,000-
Plastering throughout£4,500£7,500£12,000-
Kitchen (supply & fit)£8,000£18,000£45,000-
Bathrooms (per room)£6,000 /per room£12,000 /per room£25,000 /per room-
Joinery & finishes£4,500£9,000£22,000-
Decoration£3,500£6,500£12,000-
Project management£3,000£6,000£12,000-
Total (Fixed Items)£38,000£70,500£142,000

What Affects House Refurbishment Cost?

high impact

Property size (sqm)

Larger floor area means more materials, labour, and trades.

high impact

Specification level

Mid-range vs prime joinery, kitchens, sanitaryware and finishes.

high impact

Services replacement

Full rewire, replumb and new heating add £15-30k on a typical 3-bed.

high impact

Conservation/listed status

Heritage approvals and specialist trades increase scope and time.

medium impact

Hidden defects

Damp, rot, asbestos or non-compliant works uncovered after strip-out.

medium impact

Access and protection

Narrow access, lift bookings, and shared structures add programme cost.

✓ Included in Our Quotes

  • Project management end-to-end
  • Site protection and security
  • Trades coordination across all stages
  • Building Control liaison and certification
  • Schedule of works and progress reporting
  • Final clean and snagging

✗ Not Included (May Be Extra)

  • Planning applications and consultancy
  • Structural engineer fees
  • Party wall agreements and surveyors
  • Bespoke furniture and styling
  • High-end designer specification fixtures
  • Listed-building consents and heritage reports

💡 Money-Saving Tips

Sequence works to avoid touching plaster twice — finalise services before second-fix.

Choose mid-range fixtures with timeless aesthetics over trend-led prime brands.

Avoid moving plumbing or kitchens — keep core services in existing locations where possible.

Bundle bathrooms and kitchen with the rewire to share scaffolding and access.

Engage one main contractor rather than separate trades — reduces management overhead.

House Refurbishment Cost FAQs

Find answers to common questions about our services.

Typical 3-bed terrace: 12-18 weeks. Larger or listed properties: 20-30 weeks. Programmes depend on planning, services, and access.
For full refurbishments we strongly recommend it — utilities are disconnected, plaster is removed, and dust travel is significant. Phased works can keep one floor habitable for smaller projects.
Yes — once a detailed scope and specification are agreed we issue a fixed-price quote. Provisional sums are used for items not yet specified (e.g. kitchen or bathroom suite selection).

Get an Accurate House Refurbishment Quote

Our prices are transparent with no hidden fees. Get a detailed quote for your project today.

Mon-Fri 07:00 - 19:00 · Sat 08:00 - 17:00 · Mobile for fast updates, office line for quotes and showroom enquiries.

HAMPSTEAD RENOVATIONS - Your trusted London property renovation and refurbishment specialists

https://www.hampsteadrenovations.co.uk/ | Email: contact@hampsteadrenovations.co.uk

WhatsApp